Bo Frost headquarters San Vito al Tagliamento, Italy
​
Completed 1994
Realization amount: L. 15.000.000,00
Client: Bo Frost* Italy
Role: Structural, executive and assembling drawing, building site supervision.
​
Construction of various blocks of refrigerated rooms with low temperature (-30C) in metallic carpentry, foundation structures made in reinforced concrete, wall plugs made using sandwich panels, for a total volume of 100.000 cube metres. Between the upper and the lower part of the trusses of the refrigerated rooms - with a span of ca. 40 m - we obtained two floors assigned to offices. There are also two automated warehouses. Construction of an office building, in metallic carpentry, with three levels and wall plugs in glass and aluminium.
​
​
​
​
​
​
​
Costruzione di più lotti di celle frigorifere a bassa temperatura (-30C) in carpenteria metallica, opere di fondazione in c.a., tamponamenti con pannelli sandwich, per un volume complessivo raffreddato di circa 100000 mc. Tra le briglie superiore ed inferiore delle capriate delle celle, di luce superiore a 40,00 mt sono stati ricavati due piani abitabili destinati ad uso uffici.Vi sono inoltre due magazzini automatizzati. Costruzione di una palazzina uffici, anch’essa in carpenteria metallica, su tre piani con tamponamenti in vetro strutturale e pannelli di alluminio.